SK Favorit Engineering
SK Favorit Engineering is a Kazakhstani construction company that delivers projects in telecommunications and linear infrastructure. We act as a production partner for general contractors, telecom operators, industrial enterprises and government organizations that need a large volume of work completed on schedule.
Full cycle
From route survey to a finished section
The company specializes in construction of backbone and regional fiber-optic communication lines. We take on the full cycle: we survey the route, plan the section, mobilize equipment and field crews, carry out earthworks, lay cable and arrange crossings through natural and artificial obstacles.
After laying, specialists perform installation and splicing of optical fiber, take the required measurements and prepare as-built documentation. This approach lets us control quality at every stage and hand over a finished section ready for further operation.
-
Route survey
-
Section planning
-
Mobilization of equipment and crews
-
Earthworks and cable laying
-
Fiber installation and splicing
-
Measurements and as-built documentation
Geography
Project delivery experience
SK Favorit Engineering has completed projects in Urker, Zhetigen and Alatau. The company also took part in infrastructure construction in Almaty Region and laid backbone lines on the western and southern directions of Kazakhstan.
Completed projectsAccumulated experience allows work on long routes, in different climatic conditions and on sections with difficult terrain. The company considers projects from 100 kilometers in length and forms column composition according to soil category, the number of crossings and the required construction schedule.
| Geography | Role |
|---|---|
| Urker | Completed project |
| Zhetigen | Completed project |
| Alatau | Completed project |
| Almaty Region | Infrastructure construction |
| Western and southern directions of Kazakhstan | Laying of backbone lines |
- West Kazakhstan Region
- Atyrau Region
- Kostanay Region
- Akmola Region
- Zhetysu Region
- Almaty Region
Base
Production capacity
The production base is built around the company’s own equipment fleet, held on the company balance sheet. Mechanized columns and specialized equipment for cable laying, route preparation and obstacle crossings are used on the work.
Equipment fleetWhen needed, SK Favorit Engineering reinforces the fleet with equipment from proven partners. This helps scale output quickly, distribute resources between sections and keep schedules on high-intensity projects.
Obstacles
How we pass obstacles
Horizontal directional drilling is used to cross roads, railways, rivers and other major obstacles. Short crossings use horizontal directional piercing. On sections where a mechanized column cannot pass, work is done by trench method with additional specialized equipment.
| Section | Method |
|---|---|
| Roads, railways, rivers and other major obstacles | Horizontal directional drilling (HDD) |
| Short crossings | Horizontal directional piercing (pipe jacking) |
| Sections where a mechanized column cannot pass | Trench method with additional specialized equipment |
For clients
A contractor for large infrastructure projects
SK Favorit Engineering is oriented toward organizations that need a contractor with its own production base and field-work experience. The company can join a project as a full-cycle contractor or take on a separate long section as part of a larger infrastructure build.
A Category II construction license (СМР II) widens the company’s competence and allows work in digital infrastructure, energy, transport construction and the public sector.
Management
Company management
First registered: 12.01.1998.
-
Vladimir Zakaliuzhnyi
Chief Executive Officer
-
Aleksandr Gubarevich
Chief Operating Officer