Freedom Cloud Holding
Cloud and data-center infrastructure
fch.kzTelecom operators and infrastructure holdings that trust us. The three organizations on this page are the same as in the “Trusted by” band on the home page.
Full project cycle: from survey and design to handover.
Individual work types under a Category II construction license as part of a larger project.
Mechanized volumes under a general contractor: columns, HDD, earthworks.
01
You send the site details: geography, expected volume, types of work and the required timeline.
02
We decide which mix of equipment, specialists and mechanized columns the task needs.
03
Once scope, timeline and responsibility zones are agreed, we mobilize and start the works.
What we take on
Backbone and urban lines, a full 10-stage cycle
Trenches, pits, foundation works
5 Goodeng rigs - crossings under roads, railways and rivers
16 Shantui bulldozers, up to 40 km per day when coupled
Linear structures, power transmission lines up to 110 kV and above
Networks, substations, outdoor lighting
11 own prime movers and lowboys - arriving on site without rental
Proof · everything can be checked on the site
Newsletter
Completed projects, new equipment and permits - brief, and only when there is something to show. Unsubscribe in any email.
SK Favorit assistant
AI answers from the website content
Answers are AI-generated and may contain mistakes. Please do not share personal data in the chat - privacy policy.