Construction of power supply lines and outdoor electrical networks

We build power supply lines and outdoor electrical networks under a Category II construction license - the permit covers power transmission lines up to 110 kV and above. We deliver and install poles with own crane trucks; we perform outdoor lighting and site power: UPS, diesel generators and metering systems.

Request a line construction estimate

For an estimate, specify the line length, voltage class, region and timeline.

Setting a pole with a crane truck

Scope of work

What we build in energy

Six types of work per the company production program.

Power supply networks

Utility networks and communications per the license annex

Power transmission lines

Up to 110 kV and above - permit per the license annex

Substations

Including on transport facilities

Outdoor lighting

Urban and transport facilities

Site power

UPS and diesel generator sets

Metering systems

Intelligent metering systems

Stages

How we build a line

The sequence of works on a linear power supply facility.

  1. Route survey

    Line route, soils and access conditions

  2. Mobilization

    Equipment and materials to site by own tractor units

  3. Earthworks

    Pits for poles and trenches for cable lines

  4. Pole installation

    Delivery and erection of poles by crane trucks

  5. Network installation

    Lines, outdoor lighting, site power

  6. Documentation and handover

    As-built documentation and handover to the client

Equipment

Equipment on the line

Crane trucks deliver and install poles and materials; backhoe loaders prepare the pits.

The full fleet
  • Crane trucks

    17 units

    Loading and delivery of fiber-optic cable drums and materials along the route.

    DongFeng 6x6 - 17

  • Backhoe loaders

    24 units

    Earthworks: pits for HDD, trenches on difficult sections, loading.

    Hidromek 102B - 24

  • Tractor units and lowboys

    11 units

    Hauling heavy equipment between sections, mobilizing columns to site.

    HOWO V7 - 3 · HOWO MAX - 6 · SITRAK - 2

  • Tractors

    5 units

    Support works on the route and column support.

    DongFeng DF904 - 5

Scope of works

Works and permit basis

Each type of work is confirmed by the license annex or the production program.

Type of workBasis
Power transmission linesUp to 110 kV and above - annex to the Category II construction license
Power supply networks“Utility networks” group in the license annex
Substations and outdoor lightingProduction program: energy and transport facilities
Site power: UPS, diesel generatorsCompany production program
Installation of process equipmentWork group in the license annex

License № 01 ГСЛ-КР №010236 with annex is published on the site in the Licenses section.

Timing and cost

Timing and what affects the cost

Timing and cost depend on the line parameters and route conditions; we prepare the estimate based on the technical specifications.

Line length

Route length and number of poles

Voltage class

Power supply networks or power transmission lines up to 110 kV and above

Soils

Pits for poles and trenches for cable

Scope of works

Line, substation, lighting, site power

Region and mobilization

Site remoteness and hauling equipment

Handover deadline

Required deadline and number of crews on site

Request a line construction estimate

For an estimate, specify the line length, voltage class, region and timeline.

Work regions

Where we work

Six regions where the company works. Equipment reaches other sites with our own tractor units.

  • West Kazakhstan Region
  • Atyrau Region
  • Kostanay Region
  • Akmola Region
  • Zhetysu Region
  • Almaty Region
Work map

Licence and permits

Basis of the permit

State Category II construction and installation license № 01 ГСЛ-КР №010236; first issued 12.10.1999.

  • 06Linear structures

    Power transmission lines up to 110 kV and above, nationwide and international communication lines, oil and gas pipelines

  • 01Utility networks and systems

    Water supply, heat supply, sewerage, power supply, outdoor lighting, gas supply

  • 03Installation of process equipment

    Communications, emergency protection, control and alarm systems, metering devices, commissioning

License and annex

Questions and answers

The essentials in brief

What power transmission lines do you build?

Power transmission lines up to 110 kV and above - the permit is fixed in the annex to the Category II construction license; the license is published on the site.

Do you install poles with your own equipment?

Yes. Poles are delivered and installed by own DongFeng 6x6 crane trucks - 17 units in the fleet; pits are prepared by Hidromek backhoe loaders.

What does site power include?

Power supply networks, uninterruptible power supplies (UPS), diesel generator sets and intelligent metering systems.

Do you perform outdoor lighting?

Yes. Outdoor lighting is part of the direction, including on transport facilities - together with substations along roads.

Can you perform the energy part as part of a large project?

Yes, we work as a specialist contractor or subcontractor on individual types of work - the formats are described on the For partners page.