Mechanized laying of cable and HDPE ducts

We lay cable and protective HDPE ducts with mechanized columns: cable layers based on Shantui bulldozers place the line in the ground to a depth of 120 cm in a single pass - up to 40 km a day. We mobilize a column with its equipment and crew for the project in the regions of Kazakhstan by own tractor units.

Request a mechanized column

For an estimate, specify the route length, region, soil category and timeline.

Cable layer on the route

Scope of work

Where mechanized laying is used

A method for backbone and extended linear facilities where the route runs in the ground for tens and hundreds of kilometers.

Backbone FOCL

Intercity lines in the ground - 942 km in five months in the west and south of the country

Protective HDPE ducts

Laying a duct in the ground into which the cable is then blown

Regional networks

Branched routes across districts - 4 253 km in Almaty Region

Category 1-5 soils

Light and heavy columns matched to the soil category of the section

Any weather

Heavy columns work regardless of weather conditions

A column per section

A column with its crew for a separate section of a general contractor

Stages

Five operations, one pass

The field cycle of a column is part of the full construction cycle, from survey to handover to the client.

  1. Route staking

    The route axis is staked out before the column passes

  2. Trench ripping

    Preparing the soil along the route axis before laying

  3. Cable laying

    The cable or HDPE duct goes into the ground to a depth of 120 cm

  4. Backfilling the trench

    The trench is backfilled with soil behind the laying

  5. Restoring the ground and road

    The surface and roads are restored after the pass

Equipment

Column composition

A cable layer, bulldozers, an excavator, a crane truck, a lowboy and support vehicles - all from the own fleet.

The full fleet
  • Cable-laying columns

    16 bulldozers

    Mechanized FOCL laying in the ground to a depth of 120 cm.

    Up to 40 km a day in tandem, totaling up to 1 700 km of cable a month.

    Shantui SD34 - 6 · Shantui SD32 - 8 · Shantui SD22 - 2

  • Backhoe loaders

    24 units

    Earthworks: pits for HDD, trenches on difficult sections, loading.

    Hidromek 102B - 24

  • Crane trucks

    17 units

    Loading and delivery of fiber-optic cable drums and materials along the route.

    DongFeng 6x6 - 17

  • Tractor units and lowboys

    11 units

    Hauling heavy equipment between sections, mobilizing columns to site.

    HOWO V7 - 3 · HOWO MAX - 6 · SITRAK - 2

  • Tractors

    5 units

    Support works on the route and column support.

    DongFeng DF904 - 5

  • Pickups

    90 units

    Mobility of crews and engineering staff along the full length of the route.

    Changan Hunter Plus - 43 · Great Wall Poer - 36 · GW Poer Kingkong - 11

Output

Column pace by soil category

Capacity of light and heavy columns per the production program.

ColumnSoilsPer dayPer month
Light columncategories 1-2up to 30 kmup to 600 km
Heavy columns in tandemcategories 3-4up to 40 kmup to 900 km
Heavy columncategory 5up to 10 kmup to 200 km

In total, five columns and sixteen bulldozers - up to 1 700 km of cable a month. Data: the company production program.

Timing and cost

Timing and what affects the cost

The timeline is calculated from the column pace in the soils of the section: from 10 km a day in category 5 soils to 40 km for heavy columns in tandem.

Route length

Kilometers and number of sections

Soil category

Determines the column type and pace

Number of columns

In light soils a heavy column splits into parallel groups

Cable or HDPE duct

What is laid in the ground on the section

Obstacle crossings

Sections the column cannot pass: HDD, pipe jacking or trench

Region and mobilization

Site remoteness and hauling the column by tractor units

Request a mechanized column

For an estimate, specify the route length, region, soil category and timeline.

Work regions

Where we work

Six regions where the company works. Equipment reaches other sites with our own tractor units.

  • West Kazakhstan Region
  • Atyrau Region
  • Kostanay Region
  • Akmola Region
  • Zhetysu Region
  • Almaty Region
Work map

Licence and permits

Basis of the permit

State Category II construction and installation license № 01 ГСЛ-КР №010236; first issued 12.10.1999.

  • 06Linear structures

    Power transmission lines up to 110 kV and above, nationwide and international communication lines, oil and gas pipelines

  • 04Special works in soils

    Drilling works, underwater technical works, works on the continental shelf, foundation construction

License and annex
A Shantui cable-laying bulldozer with a cable drum on the route, crew laying cable
Cable layer on the route
A cable-laying column lays a route in the foothills, with a field camp and equipment in the background
Column in the foothills

Questions and answers

The essentials in brief

How does mechanized laying differ from trench laying?

A cable layer places the cable in the ground to a depth of 120 cm in a single column pass: staking, ripping, laying, backfilling and restoration. The trench method is used on hard-to-reach sections where a bulldozer cannot work.

How many kilometers a day does a column cover?

A light column in category 1-2 soils - up to 30 km a day, heavy columns in tandem in category 3-4 soils - up to 40 km, a heavy column in category 5 soils - up to 10 km. The combined capacity of five columns - up to 1 700 km a month.

Do you lay HDPE duct, not only cable?

Yes. Besides cable, the column lays protective HDPE duct in the ground, into which the cable is then blown.

Can a column be engaged for a section as a subcontract?

Yes. We work as a general contractor, specialist contractor or subcontractor; equipment is mobilized by own tractor units. The formats are described on the For partners page.

Do the columns work in bad weather?

Heavy columns work regardless of weather conditions.